Lovin' Chunky Cables
I've got just a few more rows on the back before binding off on the sweater for M for Christmas. Then it's just the sleeves to go, and I'll actually be ahead on my holiday knitting. When I started this project, or more accurately, when I started contemplating this project, I feared it would sink my holiday knitting. On the contrary, it's been fun and mostly painless. Plus, it's really pretty. I'm assuming it'll block out okay. Right now, the cables and rib really pull in, but otherwise, this is turning out to be a great knit. After the initial problem with the rib on the left side (I thought there was a problem with the directions for both sides, but it turned out to just be the left that was incorrectly written), it's been smooth and speedy sailing.


